CIDB Grade G4 Contractor (PPK: 1970218-WP023002)
commercialrenovation.my
Restaurant Renovation Malaysia by Bina Commercial Renovation Expert

49 towns · CIDB Grade G4

Bina Commercial Renovation Expert Restaurant Renovation Malaysia

Bina Commercial Renovation Expert provides restaurant renovation in Malaysia for restaurants and cafes from Klang Valley to Johor, Penang, the East Coast, Sabah and Sarawak. Restaurant, cafe and F&B fit-outs: commercial kitchens, exhaust and fresh-air systems, grease traps, dining interiors and hygiene-ready finishes.

CIDB Grade G4

Registered contractor, PPK 1970218-WP023002

Since 1991

35+ years in construction

49 towns

Peninsular, Sabah & Sarawak

One contract

Design, approvals, M&E and build

Work carried out to UBBL 1984Bomba · Fire Services Act 1988Suruhanjaya Tenaga · Form G & HOSHA 1994MS 1184 accessibilityStrata Management Act 2013

Restaurant Renovation

Restaurant Renovation in Malaysia: what the work covers

Restaurant renovation is two projects in one: a dining room that sets the mood and a commercial kitchen that has to pass inspection. The kitchen drives the budget — exhaust hood and ducting, fresh-air make-up, gas, drainage with a grease trap, and washable finishes that meet the Food Hygiene Regulations 2009.

1

Food premises rules, licences and halal planning

A food business needs a premises licence from the local council, and the kitchen must meet the Food Hygiene Regulations 2009 under the Food Act 1983: smooth washable surfaces, adequate lighting and ventilation, hand-wash basins and pest-proofing. Most councils also require a grease trap before kitchen waste water reaches the sewer. If you plan to apply for JAKIM halal certification, we plan separate storage and workflow early, because it is hard to retrofit later.

2

Kitchen layout and dining interior

The kitchen is laid out as a one-way flow — receiving, cold and dry storage, preparation, cooking, plating, then dishwashing — so raw and cooked food never cross. Walls get food-grade panels or full-height tiles, floors get slip-resistant tiles or seamless resin with coved skirting and falls to floor traps. Front of house, we plan seating density, the service counter and acoustic treatment so the room is lively without being loud.

3

Exhaust, fresh air, gas and drainage

Cooking lines need a stainless-steel exhaust hood with grease filters, ducting to an approved discharge point and fresh-air make-up so the dining room is not pulled into negative pressure. Gas piping is installed and tested by a competent gas contractor. Drainage, grease trap sizing and hot-water supply are set from the menu and peak covers, not guessed.

4

Inspection-ready handover

We hand over with test certificates for electrical, gas and fire services, cleaning of ducts and hoods, and a defects period. Timing is planned around your licence inspection so the premises is ready to open as soon as approvals land.

Process

How restaurant renovation runs with us

  1. Step 1

    Site survey

    We measure the space, test existing services and read the building or landlord rules.

  2. Step 2

    Design & quotation

    Layout, finishes and M&E drawings, with an itemised quotation on the same scope.

  3. Step 3

    Approvals

    Building management, local council and Bomba submissions where the works require them.

  4. Step 4

    Build

    Partitions, ceilings, M&E, finishes and fittings, phased around your business if needed.

  5. Step 5

    Test & handover

    Electrical and fire test certificates, snag walk, as-built drawings and a defects period.

Locations

Restaurant Renovation by town

W.P. Kuala Lumpur

Selangor

W.P. Putrajaya

Negeri Sembilan

Melaka

Johor

Perak

Pulau Pinang

Kedah

Pahang

Terengganu

Kelantan

Sarawak

Sabah

Perlis

FAQ

Restaurant Renovation: common questions

What does a restaurant kitchen need to pass inspection?

Washable, smooth wall and floor surfaces, proper lighting and ventilation, hand-wash basins, pest-proofing and a grease trap where the council requires it, in line with the Food Hygiene Regulations 2009. The council premises licence inspection checks these items.

How long does a restaurant renovation take?

A typical 1,500–3,500 sq ft outlet takes about 6 to 10 weeks on site. Exhaust ducting routes, landlord approvals and kitchen equipment lead times decide the programme.

Can you convert a shop lot into a restaurant?

Often, yes, but it depends on the building. We check whether exhaust can be routed to an approved discharge point, whether drainage can take a grease trap, and whether the council allows food premises at that address before you commit.

What does a restaurant renovation cost?

Usually starts from RM30,000 depending on project (need custom quote to be fair based on site condition & scope). The kitchen exhaust, gas and drainage work usually costs more than the dining interior.

Tell us about your space

Send the address, the floor area and what the space needs to do. We arrange a site survey and give you a quotation you can compare line by line.

Usually starts from RM30,000 depending on project (need custom quote to be fair based on site condition & scope).

Planning first? Try the free cost calculator or scope builder.

WhatsApp +60 13-340 7007

Any question or technical correction — our admin is ready to help. You can ask directly through our official WhatsApp.