CIDB Grade G4 Contractor (PPK: 1970218-WP023002)
commercialrenovation.my
Commercial Renovation Projects by Bina Commercial Renovation Expert

Project profiles

Bina Commercial Renovation Expert Commercial Renovation Projects

Bina Commercial Renovation Expert sets out its commercial renovation projects by type of premises: what the site looked like, what the job involved and what was handed over. Clients are described by facility type only, never by name.

35+

years since 1991

G4

CIDB grade

49

towns covered

5

premises types

Office Renovation

Corporate headquarters floor in a strata office tower

Approx. 5,000 sq ft, 60 workstations

Office Renovation: site condition before works
Before · site diagnostic

Dated cellular offices, tired carpet and overloaded power points; the ceiling grid hid ACMV ducts that no longer matched the room layout.

Office Renovation: completed space at handover
After · handover

Open-plan floor with glass meeting rooms, new LED lighting, rebalanced ACMV, structured cabling to every desk, and a pantry relocated next to the riser.

Office Renovation specification
Typical programme6–12 weeks for 2,000–6,000 sq ft (typical, subject to approvals)
Ceiling heightsUsually 2.6–2.8 m finished, set by existing services above
Lighting targetAround 300–500 lux for desk work (common design range)
Electrical sign-offForm G & Form H by a registered electrical contractor
ApprovalsBuilding management, local council, Bomba where fire services change

Planning something similar? See how we handle office renovation or send us your floor plan.

Shop Renovation

Fashion retail unit in a regional shopping mall

Approx. 1,400 sq ft with stockroom

Shop Renovation: site condition before works
Before · site diagnostic

Previous tenant’s fittings stripped to bare shell; ceiling cut open and old signage brackets left on the bulkhead.

Shop Renovation: completed space at handover
After · handover

New glass shopfront, slatwall display system, two fitting rooms, track lighting and a cashier counter, finished within the mall’s night-works window ahead of the opening date.

Shop Renovation specification
Typical programme3–8 weeks for a 600–2,500 sq ft unit (typical)
Mall works windowCommonly night shifts after trading hours
Display lightingAdjustable LED track spots on feature walls
SignageAdvertisement licence from the local council (shop lots)
ApprovalsMall design team or local council; Bomba for fire services changes

Planning something similar? See how we handle shop renovation or send us your floor plan.

Restaurant Renovation

Corner-lot family restaurant in a commercial centre

Approx. 2,800 sq ft, 90 covers

Restaurant Renovation: site condition before works
Before · site diagnostic

Ex-retail shop lot with no kitchen exhaust, a single floor trap and painted plaster walls unsuitable for food preparation.

Restaurant Renovation: completed space at handover
After · handover

Commercial kitchen with stainless hood, fresh-air make-up, grease trap, coved resin floor and wall panelling, plus a refreshed dining room and facade.

Restaurant Renovation specification
Typical programme6–10 weeks for a 1,500–3,500 sq ft outlet (typical)
Kitchen floorSlip-resistant tile or seamless resin with coved skirting
Kitchen wallsFood-grade panels or full-height tiles, washable
ExhaustStainless hood with grease filters plus fresh-air make-up
Key rulesFood Hygiene Regulations 2009, council premises licence, grease trap

Planning something similar? See how we handle restaurant renovation or send us your floor plan.

Clinic Renovation

Dental clinic in a ground-floor shop lot

Approx. 1,800 sq ft, 3 surgeries

Clinic Renovation: site condition before works
Before · site diagnostic

Former office space with carpet, no floor trenching for chair services and a narrow step at the entrance.

Clinic Renovation: completed space at handover
After · handover

Three surgeries with chair services in trenched floors, a separate sterilisation room, seamless vinyl throughout, an accessible ramp and toilet, and a bright reception.

Clinic Renovation specification
Typical programme6–10 weeks for a 1,200–3,000 sq ft clinic (typical)
Clinical floorsSeamless vinyl with coved skirting
RegulatorMinistry of Health under Act 586
AccessibilityEntrance, corridor and toilet to MS 1184 guidance
Dental servicesCompressed air, suction and water at each chair

Planning something similar? See how we handle clinic renovation or send us your floor plan.

Factory Renovation

Light-manufacturing plant with attached warehouse

Approx. 40,000 sq ft production and storage

Factory Renovation: site condition before works
Before · site diagnostic

Dusting, cracked concrete floor; leaking roof gutters; dim metal-halide lighting; a cramped office with no proper canteen.

Factory Renovation: completed space at handover
After · handover

Repaired floor with epoxy coating and marked walkways, re-sheeted roof sections and resized gutters, LED high-bays, plus a new mezzanine office and canteen — delivered zone by zone while production continued.

Factory Renovation specification
Typical programme8–16 weeks, phased by zone (typical)
Floor systemsEpoxy or PU coatings matched to traffic and chemicals
LightingLED high-bay with optional motion/daylight control
Safety frameworkOSHA 1994 and the site permit-to-work system
Electrical sign-offForm G & Form H by a registered electrical contractor

Planning something similar? See how we handle factory renovation or send us your floor plan.

Profiles describe representative scopes delivered by Bina Integrated Technology Sdn. Bhd.. Photographs are illustrative and do not show a named client’s premises.

Tell us about your space

Send the address, the floor area and what the space needs to do. We arrange a site survey and give you a quotation you can compare line by line.

Usually starts from RM30,000 depending on project (need custom quote to be fair based on site condition & scope).

Planning first? Try the free cost calculator or scope builder.

WhatsApp +60 13-340 7007

Any question or technical correction — our admin is ready to help. You can ask directly through our official WhatsApp.