Project profiles
Bina Commercial Renovation Expert Commercial Renovation Projects
Bina Commercial Renovation Expert sets out its commercial renovation projects by type of premises: what the site looked like, what the job involved and what was handed over. Clients are described by facility type only, never by name.
35+
years since 1991
G4
CIDB grade
49
towns covered
5
premises types
Office Renovation
Corporate headquarters floor in a strata office tower
Approx. 5,000 sq ft, 60 workstations
Dated cellular offices, tired carpet and overloaded power points; the ceiling grid hid ACMV ducts that no longer matched the room layout.
Open-plan floor with glass meeting rooms, new LED lighting, rebalanced ACMV, structured cabling to every desk, and a pantry relocated next to the riser.
| Typical programme | 6–12 weeks for 2,000–6,000 sq ft (typical, subject to approvals) |
|---|---|
| Ceiling heights | Usually 2.6–2.8 m finished, set by existing services above |
| Lighting target | Around 300–500 lux for desk work (common design range) |
| Electrical sign-off | Form G & Form H by a registered electrical contractor |
| Approvals | Building management, local council, Bomba where fire services change |
Planning something similar? See how we handle office renovation or send us your floor plan.
Shop Renovation
Fashion retail unit in a regional shopping mall
Approx. 1,400 sq ft with stockroom
Previous tenant’s fittings stripped to bare shell; ceiling cut open and old signage brackets left on the bulkhead.
New glass shopfront, slatwall display system, two fitting rooms, track lighting and a cashier counter, finished within the mall’s night-works window ahead of the opening date.
| Typical programme | 3–8 weeks for a 600–2,500 sq ft unit (typical) |
|---|---|
| Mall works window | Commonly night shifts after trading hours |
| Display lighting | Adjustable LED track spots on feature walls |
| Signage | Advertisement licence from the local council (shop lots) |
| Approvals | Mall design team or local council; Bomba for fire services changes |
Planning something similar? See how we handle shop renovation or send us your floor plan.
Restaurant Renovation
Corner-lot family restaurant in a commercial centre
Approx. 2,800 sq ft, 90 covers
Ex-retail shop lot with no kitchen exhaust, a single floor trap and painted plaster walls unsuitable for food preparation.
Commercial kitchen with stainless hood, fresh-air make-up, grease trap, coved resin floor and wall panelling, plus a refreshed dining room and facade.
| Typical programme | 6–10 weeks for a 1,500–3,500 sq ft outlet (typical) |
|---|---|
| Kitchen floor | Slip-resistant tile or seamless resin with coved skirting |
| Kitchen walls | Food-grade panels or full-height tiles, washable |
| Exhaust | Stainless hood with grease filters plus fresh-air make-up |
| Key rules | Food Hygiene Regulations 2009, council premises licence, grease trap |
Planning something similar? See how we handle restaurant renovation or send us your floor plan.
Clinic Renovation
Dental clinic in a ground-floor shop lot
Approx. 1,800 sq ft, 3 surgeries
Former office space with carpet, no floor trenching for chair services and a narrow step at the entrance.
Three surgeries with chair services in trenched floors, a separate sterilisation room, seamless vinyl throughout, an accessible ramp and toilet, and a bright reception.
| Typical programme | 6–10 weeks for a 1,200–3,000 sq ft clinic (typical) |
|---|---|
| Clinical floors | Seamless vinyl with coved skirting |
| Regulator | Ministry of Health under Act 586 |
| Accessibility | Entrance, corridor and toilet to MS 1184 guidance |
| Dental services | Compressed air, suction and water at each chair |
Planning something similar? See how we handle clinic renovation or send us your floor plan.
Factory Renovation
Light-manufacturing plant with attached warehouse
Approx. 40,000 sq ft production and storage
Dusting, cracked concrete floor; leaking roof gutters; dim metal-halide lighting; a cramped office with no proper canteen.
Repaired floor with epoxy coating and marked walkways, re-sheeted roof sections and resized gutters, LED high-bays, plus a new mezzanine office and canteen — delivered zone by zone while production continued.
| Typical programme | 8–16 weeks, phased by zone (typical) |
|---|---|
| Floor systems | Epoxy or PU coatings matched to traffic and chemicals |
| Lighting | LED high-bay with optional motion/daylight control |
| Safety framework | OSHA 1994 and the site permit-to-work system |
| Electrical sign-off | Form G & Form H by a registered electrical contractor |
Planning something similar? See how we handle factory renovation or send us your floor plan.
Profiles describe representative scopes delivered by Bina Integrated Technology Sdn. Bhd.. Photographs are illustrative and do not show a named client’s premises.
Tell us about your space
Send the address, the floor area and what the space needs to do. We arrange a site survey and give you a quotation you can compare line by line.
Usually starts from RM30,000 depending on project (need custom quote to be fair based on site condition & scope).
Planning first? Try the free cost calculator or scope builder.
Any question or technical correction — our admin is ready to help. You can ask directly through our official WhatsApp.