CIDB Grade G4 Contractor (PPK: 1970218-WP023002)
commercialrenovation.my
Factory Renovation Malaysia by Bina Commercial Renovation Expert

49 towns · CIDB Grade G4

Bina Commercial Renovation Expert Factory Renovation Malaysia

Bina Commercial Renovation Expert provides factory renovation in Malaysia for factories and warehouses from Klang Valley to Johor, Penang, the East Coast, Sabah and Sarawak. Factory, warehouse and plant refurbishment: industrial floors, roofing and cladding, offices and canteens, lighting, and works phased around live production.

CIDB Grade G4

Registered contractor, PPK 1970218-WP023002

Since 1991

35+ years in construction

49 towns

Peninsular, Sabah & Sarawak

One contract

Design, approvals, M&E and build

Work carried out to UBBL 1984Bomba · Fire Services Act 1988Suruhanjaya Tenaga · Form G & HOSHA 1994MS 1184 accessibilityStrata Management Act 2013

Factory Renovation

Factory Renovation in Malaysia: what the work covers

Factory renovation upgrades an industrial building without stopping the business inside it: production and warehouse floors, roof and wall cladding, mezzanine offices, canteens and toilets, high-bay lighting, power distribution and fire services. Safety comes first — work is planned under the Occupational Safety and Health Act 1994 and the factory’s own permit-to-work system.

1

Safety, permits and live-site planning

Industrial sites run on permits: hot work, working at height, confined space and isolation. We work inside your safety system, brief our crews through your induction, and phase the work so forklift routes, fire exits and production lines stay open. Changes to the building structure, fire services or approved plans are submitted to the local council and Bomba through the appointed professionals.

2

Industrial floors, roofs and building fabric

Worn concrete floors are repaired and finished with epoxy or polyurethane coatings matched to the traffic — forklifts, chemicals, hot washdown or food production. Leaking roofs are re-sheeted or overlaid, gutters resized for tropical downpours, and wall cladding replaced or insulated to cut heat gain. Floor flatness matters wherever racking or automated equipment will stand.

3

Lighting, power and services

Old high-bay lamps are replaced with LED high-bays, often with daylight and motion controls in warehouses. New machine power, busduct or distribution boards are installed by a registered electrical contractor with Form G and Form H certificates. Compressed air, process water and exhaust are rerouted to suit the new layout.

4

Offices, canteens and handover

Most factory jobs include the people spaces: a mezzanine or ground-floor office, meeting rooms, a canteen and toilets for the workforce. Handover covers test certificates, as-built drawings and a defects period, with each zone released back to operations as soon as it is complete.

Process

How factory renovation runs with us

  1. Step 1

    Site survey

    We measure the space, test existing services and read the building or landlord rules.

  2. Step 2

    Design & quotation

    Layout, finishes and M&E drawings, with an itemised quotation on the same scope.

  3. Step 3

    Approvals

    Building management, local council and Bomba submissions where the works require them.

  4. Step 4

    Build

    Partitions, ceilings, M&E, finishes and fittings, phased around your business if needed.

  5. Step 5

    Test & handover

    Electrical and fire test certificates, snag walk, as-built drawings and a defects period.

Locations

Factory Renovation by town

W.P. Kuala Lumpur

Selangor

W.P. Putrajaya

Negeri Sembilan

Melaka

Johor

Perak

Pulau Pinang

Kedah

Pahang

Terengganu

Kelantan

Sarawak

Sabah

Perlis

FAQ

Factory Renovation: common questions

Can you renovate a factory without stopping production?

Yes, in most cases. We divide the site into zones, agree a sequence with your operations team, and work nights, weekends or planned shutdowns for the areas that cannot be isolated during production.

What floor coating is best for a factory?

It depends on the traffic. Epoxy suits dry areas with forklifts; polyurethane handles hot washdown, thermal shock and many chemicals better. We test the concrete first, because moisture and weak surface strength cause most coating failures.

How long does a factory renovation take?

Typically 8 to 16 weeks, released zone by zone. Roof work depends on the weather, and floor coatings need curing time before forklifts return.

What does a factory renovation cost?

Usually starts from RM30,000 depending on project (need custom quote to be fair based on site condition & scope). Floor area, roof condition and electrical upgrades are the biggest cost drivers.

Tell us about your space

Send the address, the floor area and what the space needs to do. We arrange a site survey and give you a quotation you can compare line by line.

Usually starts from RM30,000 depending on project (need custom quote to be fair based on site condition & scope).

Planning first? Try the free cost calculator or scope builder.

WhatsApp +60 13-340 7007

Any question or technical correction — our admin is ready to help. You can ask directly through our official WhatsApp.