CIDB Grade G4 Contractor (PPK: 1970218-WP023002)
commercialrenovation.my
Commercial Renovation Miri by Bina Commercial Renovation Expert

Sarawak · East Malaysia Malaysia

Bina Commercial Renovation Expert Commercial Renovation Miri

Bina Commercial Renovation Expert delivers commercial renovation in Miri for offices, shops, restaurants, clinics and factories. Work in Miri is run under one contract, from the first survey to the defects period. Council approvals in Miri go through Majlis Bandaraya Miri (MBM).

CIDB Grade G4

Registered contractor, PPK 1970218-WP023002

Since 1991

35+ years in construction

49 towns

Peninsular, Sabah & Sarawak

One contract

Design, approvals, M&E and build

Work carried out to UBBL 1984Bomba · Fire Services Act 1988Suruhanjaya Tenaga · Form G & HOSHA 1994MS 1184 accessibilityStrata Management Act 2013

Approvals

How renovation approvals work in Miri

Permits for renovation in Miri that touch structure, the facade, the approved layout or fire services are handled by Majlis Bandaraya Miri (MBM). Purely cosmetic work usually needs only the landlord’s or building management’s permit, but the exact list differs between councils, so we confirm it at survey stage rather than assume.

Where fire services change — sprinklers, detectors, exits — the design goes through the building’s fire consultant and a Bomba-registered contractor, and new electrical work in Miri is certified with Form G and Form H by a Suruhanjaya Tenaga registered contractor.

Miri is across the South China Sea from our Bangi head office, so projects here are scoped case by case: we agree survey dates in advance, plan supervision for the full programme, and confirm which materials are sourced locally before the quotation is final.

Process

How commercial renovation in Miri runs with us

  1. Step 1

    Site survey

    We measure the space, test existing services and read the building or landlord rules.

  2. Step 2

    Design & quotation

    Layout, finishes and M&E drawings, with an itemised quotation on the same scope.

  3. Step 3

    Approvals

    Building management, local council and Bomba submissions where the works require them.

  4. Step 4

    Build

    Partitions, ceilings, M&E, finishes and fittings, phased around your business if needed.

  5. Step 5

    Test & handover

    Electrical and fire test certificates, snag walk, as-built drawings and a defects period.

FAQ

Commercial renovation in Miri: common questions

Do you take commercial renovation projects in Miri?

Yes. Bina Commercial Renovation Expert covers Miri, Sarawak. Miri is across the South China Sea from our Bangi head office, so projects here are scoped case by case: we agree survey dates in advance, plan supervision for the full programme, and confirm which materials are sourced locally before the quotation is final.

Which council approves renovation works in Miri?

Renovation permits in Miri are handled by Majlis Bandaraya Miri (MBM). Building management or landlord approval applies on top for units in strata buildings and malls.

What does commercial renovation in Miri cost?

Usually starts from RM30,000 depending on project (need custom quote to be fair based on site condition & scope).

Which premises do you renovate in Miri?

Offices, retail shops and showrooms, restaurants and cafes, clinics, and factories and warehouses in Miri and nearby towns.

Renovating in Miri?

Send the address, the floor area and what the space needs to do. We arrange a site survey and give you a quotation you can compare line by line.

Usually starts from RM30,000 depending on project (need custom quote to be fair based on site condition & scope).

Planning first? Try the free cost calculator or scope builder.

WhatsApp +60 13-340 7007

Any question or technical correction — our admin is ready to help. You can ask directly through our official WhatsApp.