Strata Renovation Rules by Bina Commercial Renovation Expert

Approvals & Compliance

Bina Commercial Renovation Expert Strata Renovation Rules

Bina Commercial Renovation Expert on Strata Renovation Rules: Under the Strata Management Act 2013, a JMB or MC can set by-laws that govern renovation in commercial strata units. Expect a refundable deposit, approved working hours, drawing review, contractor insurance and strict rules on common property such as facades, risers and fire systems.

Updated 29 November 2026 · 5 min read · Published by Bina Integrated Technology Sdn. Bhd.

Renovating inside a strata building: what the JMB or MC will ask for

Short answer

What is the difference between your unit and common property?

Your parcel is the space inside your unit. Common property includes the structure, external walls, shared risers, corridors, lifts and the main fire and water systems. You can renovate your parcel within the by-laws; touching common property needs specific approval and is often refused.

That is why tapping into a riser, moving a window or adding an outdoor condenser can take longer to approve than the whole interior.

What does the management typically require?

The list varies, but most commercial strata buildings ask for the same core items. A renovation deposit covers damage to common areas and is refunded after inspection. Working hours are fixed, with noisy work often restricted. Materials go up in a booked service lift with protection.

  • Renovation application form and drawings
  • Refundable renovation deposit
  • Contractor’s insurance and worker list
  • Approved working hours and noise rules
  • Lift booking and protection
  • Debris removal arrangements

How do you get the deposit back?

Photograph the corridor, lift and lobby before work starts and share the photos with the management. Keep debris bagged and removed on schedule. At the end, request a joint inspection. Deposits are mostly held back for scratched lifts, stained carpets and debris left in common areas — all avoidable.

For office and clinic fit-outs in strata towers, we handle the application and the condition records as part of the job.

What is the difference between a JMB and an MC?

A joint management body (JMB) manages a strata development before strata titles are issued and the first annual general meeting of the management corporation is held. A management corporation (MC) takes over once the strata titles exist. Both are set up under the Strata Management Act 2013, and both can make by-laws that control renovation in commercial units.

For a tenant, the practical difference is small: whichever body is in charge issues the renovation guidelines, collects the deposit and approves drawings. The landlord, as the unit owner, signs the application, so the tenancy agreement should say who deals with the JMB or MC.

Which renovation works need extra approval in a strata building?

Works that touch common property need more than a standard permit-to-work. Common property includes the facade, the structure, the risers, the main fire services and the building’s air-conditioning plant. Changing any of these needs the JMB or MC’s specific approval and, where structure or fire services change, the council and Bomba process as well.

Work inside the unit, such as partitions, ceilings and finishes, follows the normal renovation guidelines. The Bomba fire safety guide covers what happens when partitions affect sprinklers or detectors that belong to the building system.

How do you avoid disputes with strata management during works?

Most disputes with strata management come from three issues: work outside approved hours, damage to common areas, and debris left in lifts or corridors. Agreeing the lift booking, protection of lift interiors and debris removal route before work starts prevents all three.

A photo record of the corridor, lift lobby and unit entrance before work starts protects the deposit at the end. Our office renovation team takes that record on the first day of every strata job.

Illustrative example: renovating a shop-office unit in a strata block

Illustrative example, not a client project: a tenant renovates a first-floor unit in a strata shop-office block in Subang Jaya. The landlord collects the renovation guidelines from the management corporation. The guidelines require a deposit, drawings of partitions and electrical points, the contractor’s insurance and a list of workers.

Works are allowed on weekdays within set hours, with no hacking on weekends. Debris leaves through the rear staircase, not the main lobby. After completion, management inspects the corridor and staircase, finds no damage, and the deposit is refunded to the landlord, who passes it to the tenant as the tenancy agreement states.

What mistakes cost tenants their renovation deposit?

Renovation deposits are lost for repeat reasons that a site routine prevents.

  • Scratched lift interiors because protection was not installed
  • Debris left in corridors, staircases or bins overnight
  • Work outside approved hours after a complaint
  • Drilling into common walls or risers without approval
  • Blocked drains from cement or paint washed into sinks

Which strata terms matter for a commercial renovation?

These terms appear in strata renovation guidelines and tenancy agreements.

  • Common property: parts of the development not within any parcel, such as the structure, facade, lobbies and risers.
  • Parcel: an individual strata unit owned by a proprietor.
  • By-laws: rules made by the JMB or MC under the Strata Management Act 2013, including renovation rules.
  • Renovation deposit: a refundable sum held by management against damage to common property.
  • Permit-to-work: written approval from management to start renovation works under stated conditions.

Step-by-step

  1. 1 Request the renovation by-laws and forms.
  2. 2 Separate parcel works from common property works.
  3. 3 Submit drawings, insurance and deposit.
  4. 4 Record the condition of common areas.
  5. 5 Work within approved hours.
  6. 6 Request joint inspection and deposit refund.

Checklist

  • By-laws received
  • Common property works identified
  • Deposit paid and receipt kept
  • Before photos taken
  • Joint inspection booked

Key takeaways

  • Common property changes need specific approval.
  • Deposits are refunded after inspection.
  • Condition photos protect your deposit.
  • Working hours are enforceable by-laws.

Strata Renovation Rules: common questions

Is the renovation deposit refundable?

Yes. The renovation deposit is refundable once management inspects the common areas after the works and confirms there is no damage or debris. Deductions apply for damage.

Can the JMB or MC refuse a renovation?

The JMB or MC can refuse works that breach its by-laws or affect common property without approval. Works inside the unit that follow the guidelines are normally approved once drawings and documents are complete.

Who pays for damage to common property during renovation?

The unit owner is responsible to the JMB or MC, and the owner recovers the cost from the contractor under the renovation contract. Contractor insurance covers this risk.

Who applies for the renovation permit in a strata building, the owner or the tenant?

The unit owner is responsible to the JMB or MC, so the owner signs the application. The tenant or contractor usually prepares it with the owner’s authorisation.

Can strata management limit working hours?

Yes. Renovation by-laws commonly set working hours and quiet periods, and contractors must follow them.

Can a tenant deal directly with the JMB or MC?

Management usually deals with the unit owner, but many allow the tenant or contractor to submit documents with the owner’s written authorisation.

Author Faiz Azizan (PhD) works as SEO author & researcher for commercialrenovation.my with Google KG. Contact via LinkedIn or web: drfaizazizan.com.

Tell us about your space

Send the address, the floor area and what the space needs to do. We arrange a site survey and give you a quotation you can compare line by line.

Usually starts from RM30,000 depending on project (need custom quote to be fair based on site condition & scope).